Hospital Emergency Backup Power System
Back to ProjectsInstitutional

Hospital Emergency Backup Power System

Nakuru County Hospital
2023
120-bed hospital facility, complete backup power infrastructure

Project Overview

Critical power infrastructure project for a 120-bed hospital in Nakuru. We installed a comprehensive backup power system including two 500kVA diesel generators, automatic transfer switches, and UPS systems for critical care areas. The system ensures uninterrupted power supply to operating theaters, ICU, emergency department, and all life-support equipment. All work was done to meet strict healthcare electrical safety standards.

Complete backup power system installation for medical facility with dual generators and UPS.

Project Details

Client
Nakuru County Health Department
Location
Nakuru County Hospital
Year
2023
Scope
120-bed hospital facility, complete backup power infrastructure
Hospital Emergency Backup Power System - Featured 1
Hospital Emergency Backup Power System - Featured 2
Hospital Emergency Backup Power System - Gallery 3
Hospital Emergency Backup Power System - Gallery 4
Hospital Emergency Backup Power System - Gallery 5
Hospital Emergency Backup Power System - Gallery 6
Hospital Emergency Backup Power System - Showcase 7
Hospital Emergency Backup Power System - Showcase 8

Technical Specifications

Generator Capacity
2 x 500kVA diesel
UPS Systems
3 x 100kVA for critical areas
Automatic Transfer Switches
4 units
Fuel Storage
10,000 liters (72-hour runtime)
Critical Circuits
45 dedicated circuits

Challenges

  • 1

    Working in operational hospital without disrupting patient care

  • 2

    Installing heavy generators on rooftop with structural considerations

  • 3

    Meeting strict healthcare electrical safety and redundancy requirements

  • 4

    Coordinating with medical staff to test systems without affecting operations

Solutions

  • Scheduled installation work during off-peak hours and weekends

  • Conducted structural assessment and reinforcement before generator installation

  • Implemented N+1 redundancy with dual generators and automatic failover

  • Performed comprehensive load testing in phases with medical team coordination

Project Results

Zero downtime during installation - all patient care continued uninterrupted

System provides 10-second automatic switchover during power outages

Hospital now has 72-hour backup power capacity with dual fuel tanks

Passed all healthcare electrical safety inspections and certifications

"This backup power system has been a lifesaver. During the recent power outages, our hospital continued operating without any interruption. The generators kick in so fast that our equipment doesn't even notice. Excellent work by the RiftValley team."
D

Dr. Sarah Kimani

Hospital Administrator