Manufacturing Plant Automation Upgrade
Back to ProjectsIndustrial

Manufacturing Plant Automation Upgrade

Nakuru Industrial Park
2023
30,000 sq ft production facility

Project Overview

A transformative industrial project modernizing electrical systems and implementing automation for a beverage bottling plant. This comprehensive upgrade included new motor control centers, PLC-based automation systems, energy monitoring, and power quality improvements. The project increased production efficiency while reducing energy consumption and maintenance requirements, positioning the facility for Industry 4.0 readiness.

Industrial automation and electrical modernization for beverage bottling facility.

Project Details

Client
Rift Valley Beverages Ltd
Location
Nakuru Industrial Park
Year
2023
Scope
30,000 sq ft production facility
Manufacturing Plant Automation Upgrade - Featured 1
Manufacturing Plant Automation Upgrade - Featured 2
Manufacturing Plant Automation Upgrade - Gallery 3
Manufacturing Plant Automation Upgrade - Gallery 4
Manufacturing Plant Automation Upgrade - Gallery 5
Manufacturing Plant Automation Upgrade - Gallery 6
Manufacturing Plant Automation Upgrade - Showcase 7
Manufacturing Plant Automation Upgrade - Showcase 8

Technical Specifications

Production Lines
4 automated lines
PLCs Installed
12 controllers
Motor Drives
45 VFDs
Power Quality
THD <5%
Energy Monitoring
Real-time system

Challenges

  • 1

    Upgrading without halting production operations

  • 2

    Integrating new automation with legacy equipment

  • 3

    Training operators on new control systems

  • 4

    Improving power quality for sensitive electronics

Solutions

  • Implemented weekend installation schedule with rapid commissioning

  • Designed hybrid control system bridging old and new equipment

  • Conducted comprehensive training program with simulation

  • Installed active harmonic filters and power factor correction

Project Results

Production efficiency increased by 28%

Energy consumption reduced by 32%

Unplanned downtime reduced by 65%

ROI achieved in 18 months

"The automation upgrade transformed our operations. Production is faster, more reliable, and our energy bills have dropped significantly. Excellent work by RiftValley."
M

Michael Otieno

Plant Manager

Ready to Start Your Project?

Let's discuss how we can bring your electrical project to life